🏨 Аликанте разблокировал строительство нового отеля в районе Ла Альбуферета

🏨 Alicante unblocks construction of new hotel in La Albufereta district

📆 June 12, 2025, Alicante - The City Council of Alicante has issued a licence for the construction of a new hotel in the La Albufereta area, on Sierra de San Julián, 3-5 . The project, carried out by Cerámica San Román Brotons SL , involves an investment of 5.7 million euros and includes the construction of a two-star hotel with 64 rooms ( 141 beds in total).

🧱 Urban transformation: from unfinished building to new hotel

Parcella, where the unfinished building (left over from 2008) was previously located, will finally have a new purpose. As the head of the Department of Urban Development, Roquio Gomez , noted, this is not just the development of the territory , but also an investment in the appearance of the city , which will allow:

  • Increase the number of hotel beds ,
  • Update the city infrastructure ,
  • Remove visual pollution from an unfinished building.

💬 "This project restores the purpose of the site and will have a positive impact on the tourist attractiveness of the city," she emphasized.

🏗️ Project Description: Hotel by the sea with a modern design

The future hotel will be built on the existing concrete frame, which is approximately 75% preserved. However, due to long-term neglect and vandalism, most of the structures will be re-equipped and adapted to modern building standards , including:

  • Technical code of construction ,
  • Regulations for thermal installations ,
  • Energy efficiency standards for buildings and other standards.

🏨 Main characteristics of the new hotel:

  • 📍 Location : Sierra de San Julián street, overlooking La Albufereta beach and the Serra Grossa mountain
  • 🏗️ Design : U- shaped building, 4 above-ground floors + underground parking
  • 🚗 Parking : for 34 cars
  • 🛏️ Rooms : 64 rooms
  • 🛁 Additional amenities : reception, terrace, multifunctional hall , gym , spa area with swimming pool , shared bathrooms

🌆 Urban integration and infrastructure

Under the terms of the permit, the developer will also carry out a complete urbanization of the Sierra de San Julián street , including:

  • 💡 Lighting ,
  • 🚶 Sidewalks ,
  • 🚰 Connection to utilities ,
  • 🚧 Roadway repair .

📌 What does this mean for Alicante?

Growing tourist attractiveness of the La Albufereta area
Increasing the city's hotel stock
Infrastructure update
Completion of one of the longest construction projects in the city


📣 Follow the news about the development of tourism and infrastructure in Alicante - the city continues to develop for residents and visitors!

Back to blog